Week 1 · Aug 3–9
Guide availableWhat Is PrintMason? Modern Tools, Timeless Craft
Set the promise; ask readers what they hope humans build next
August 3—November 22, 2026
Sixty-four connected stories build one usable map: process, material, machine, craft, monument, frontier, and community. 30 complete guides are already live; the remaining commissions publish only after sourcing, safety review, and a useful reader action.
Commissioning roadmap
Search by subject or isolate one week. Published entries link to complete guides; planned entries remain visibly distinct.
Week 1 · Aug 3–9
Guide availableSet the promise; ask readers what they hope humans build next
Week 1 · Aug 3–9
Guide availableEstablish standards-based map; save/share the process chart
Week 1 · Aug 3–9
Guide availableCAD/scan → mesh → repair → slice → machine → finish → inspect
Week 1 · Aug 3–9
Commission plannedPost printer/material/first make; downloadable maker token
Week 2 · Aug 10–16
Guide availableExplain FFF/FDM, filament vs pellets, uses and limits
Week 2 · Aug 10–16
Guide availableMotion-system comparison; readers identify their machine
Week 2 · Aug 10–16
Guide availableFailure tree; comment with a failure photo and settings
Week 2 · Aug 10–16
Commission plannedTest extrusion, cooling and design with non-food-use vessel
Week 3 · Aug 17–23
Guide availableExplain light engines, resin cure, detail and tradeoffs
Week 3 · Aug 17–23
Guide availableGloves, ventilation, wash/cure, spills, waste and SDS
Week 3 · Aug 17–23
Guide availableShow peel forces, islands, drain paths and support scars
Week 3 · Aug 17–23
Commission plannedOriginal bas-relief; no copyrighted characters or logos
Week 4 · Aug 24–30
Guide availableCompare PLA, PETG, ABS, ASA, TPU, nylon, PC and composites
Week 4 · Aug 24–30
Guide availableStiffness, toughness, layer adhesion, creep, heat and moisture
Week 4 · Aug 24–30
Guide availableRegrind, recycled feedstock, design for repair and honest limits
Week 4 · Aug 24–30
Commission plannedUpload a standardized swatch and real settings
Week 5 · Aug 31–Sep 6
Guide availableSLS, LPBF/SLM/DMLS terms, nesting, thermal control
Week 5 · Aug 31–Sep 6
Guide availableInhalation, dust, ignition, grounding, housekeeping, training
Week 5 · Aug 31–Sep 6
Commission plannedExplain geometry advantages without claiming automatic superiority
Week 5 · Aug 31–Sep 6
Commission plannedVisual lattice only; LED use, no flame
Week 6 · Sep 7–13
Guide availableBinder, depowder, cure, debind/infiltrate/sinter
Week 6 · Sep 7–13
Guide availableDroplets, support materials, color/multi-material, limitations
Week 6 · Sep 7–13
Guide availablePrinted mold/core workflow; foundry work needs professionals
Week 6 · Sep 7–13
Commission plannedCreate original color-blocked architecture; display-only
Week 7 · Sep 14–20
Guide availablePowder/wire feed, melt pool, near-net-shape and machining
Week 7 · Sep 14–20
Guide availableBond-and-cut workflows, ultrasonic consolidation
Week 7 · Sep 14–20
Guide availableRheology, drying, firing, shrinkage, kiln limits
Week 7 · Sep 14–20
Commission plannedClay/filament interpretations; decorative use unless certified
Week 8 · Sep 21–27
Guide availableChoose/combine printing, CNC, molding, cutting and assembly
Week 8 · Sep 21–27
Guide availableRouter/mill/lathe, workholding, tooling and tolerances
Week 8 · Sep 21–27
Guide availableCell anatomy and guarding; humans supervise and validate
Week 8 · Sep 21–27
Commission plannedSketch a custom non-hazardous printer and its design constraint
Week 9 · Sep 28–Oct 4
Commission plannedStone, brick, block, restoration specialties and career paths
Week 9 · Sep 28–Oct 4
Commission plannedGeology, bedding, defects, weathering and selection
Week 9 · Sep 28–Oct 4
Commission plannedPitching, pointing, chisels, mallets, saws, abrasives and finish
Week 9 · Sep 28–Oct 4
Commission plannedDesign an original personal mark; no lodge insignia claims
Week 10 · Oct 5–11
Commission plannedGantry vs robot, pump, hose, nozzle, bead, layer and cure
Week 10 · Oct 5–11
Commission plannedPumpability, extrudability, buildability, open time, interlayers
Week 10 · Oct 5–11
Commission plannedSeparate shell demonstrations from complete compliant buildings
Week 10 · Oct 5–11
Commission plannedSafe scaled bead-pattern test; compare bond and overhang
Week 11 · Oct 12–18
Commission plannedUse the 2019–24 restoration to show living craft + modern coordination
Week 11 · Oct 12–18
Commission plannedExplain load paths conceptually; not a structural design guide
Week 11 · Oct 12–18
Commission plannedScanning, parametric geometry, CNC roughing, hand finishing
Week 11 · Oct 12–18
Commission plannedModular demonstration; explicitly non-load-bearing
Week 12 · Oct 19–25
Commission plannedProvenance, dating, context, function, uncertainty and source quality
Week 12 · Oct 19–25
Commission plannedSolstice, mortuary/ceremonial landscape, chronology, open questions
Week 12 · Oct 19–25
Commission plannedEgypt, Nubia, Mesoamerica and others: different dates/forms/functions
Week 12 · Oct 19–25
Commission plannedOffer culturally respectful, educational options and explain replicas
Week 13 · Oct 26–Nov 1
Commission plannedLiDAR, photogrammetry, uncertainty, metadata and stewardship
Week 13 · Oct 26–Nov 1
Commission plannedAuthenticity, minimal intervention, reversibility and communities
Week 13 · Oct 26–Nov 1
Commission plannedTactile models, molds, supports, replicas, research coupons
Week 13 · Oct 26–Nov 1
Commission plannedColor-code documented, inferred and unknown geometry
Week 14 · Nov 2–8
Commission plannedExplain promise, scale/material limits and research status
Week 14 · Nov 2–8
Commission plannedShape-memory/hydro-responsive concepts; no miracle claims
Week 14 · Nov 2–8
Commission plannedSpace/remote construction, local feedstock, coordination constraints
Week 14 · Nov 2–8
Commission plannedConcept must account for mass, energy, control, waste and safety
Week 15 · Nov 9–15
Commission plannedLaunch intent for models, makes, comments, remixes and reactions
Week 15 · Nov 9–15
Commission plannedLicense, version, dimensions, orientation, settings, hazards, test status
Week 15 · Nov 9–15
Commission plannedInspect topology, scale, wall thickness, flatness, tolerances, licensing
Week 15 · Nov 9–15
Commission plannedRemix an original modular keystone and post print reaction
Week 16 · Nov 16–22
Commission plannedBeauty, dignity, maintenance, accessibility, local participation
Week 16 · Nov 16–22
Commission plannedHuman-scale planning, daylight, care, landscape, craft and cost
Week 16 · Nov 16–22
Commission plannedAcoustic/vibration/fire/air/thermal separation and heat recovery
Week 16 · Nov 16–22
Commission plannedPublish metrics, corrections, reader makes and next-quarter vote
Complete guides outside the dated roadmap
Editorial code
Standards-based names come before marketing language. Technical claims need institutional or primary sources. Heritage claims identify evidence level and uncertainty. Concept art says “concept.” Safety and qualification limits live in the story—not in fine print.